As posted by Russ Stephenson on Facebook. See our take here.
Below is the text of the Feb 2nd memo on the Lightner Center delivered by Councilors Stephenson, Crowder and Gaylord to the City Manager and Council. Today’s N&O story (http://bit.ly/bzHyf7) focuses on whether to rehab the existing police station or not, but the more fundamental concerns are these:
• The top priority is to provide a new high quality emergency services facility without a tax increase.
• The current design provides less security for the police from hand-carried bombs than their existing building.
• There are no performance improvement metrics to support housing non-emergency personnel in an expensive emergency building. See ‘Analysis of Functions’ in Memo below.
• More jobs and economic development - If this building was cut roughly in half to house only emergency services (others are already housed elsewhere), many other important capital projects such as roads, parks, and transit improvements could be funded, providing jobs and improvements around the city, with greater long-term economic development benefits.
Memo text follows:
====================================================
2 February 2010
Clarence E. Lightner Public Safety Center (CELPSC) Project Memorandum
From: Councilors Stephenson, Crowder and Gaylord
To: City Manager & City Council
Evaluating current plans for the CELPSC in light of the current unprecedented economic recession has focused our efforts to make sure this project provides high quality, reliable and efficient emergency services without requiring a property tax increase. After careful review of the building design, program and back up information provided by staff, we offer these comments. Our review began with value engineering for the current design and progressed to an analysis of the main program functions and alternate scenarios.
Value Engineering
We understand value engineering is an ongoing effort by the designers, staff and the Construction Manager At-Risk. Accordingly, the design documents provided to us do not reflect a number of elements that have already been modified or eliminated. It would be helpful to have an updated list or marked-up drawings identifying these items. Here are items we noted in meeting with the designers.
•911 Call Center
We continue to question the need for a 30+ foot tall space enclosed largely by floor-to-ceiling laminated frameless glass, with a viewing gallery.
• Semicircular Stair
The corner stair between floors 14 & 15 seems redundant.
• 2nd floor Multi-Purpose Assembly Room
This sort of large space and pre-function area is probably available elsewhere.
• 3rd Floor Fitness Center replaced
We understand this fitness center may be replaced with a credit union, but rather than adding functions unrelated to emergency operations, consider reducing the building size.
• Curtain Wall Extension Details
The building envelope is well proportioned, but may be over-designed for this context.
• Building Inset at 3rd Floor
Reduces useable square footage by about 3000sf. Green roof justification seems marginal.
• Interior Finishes & Fixtures
Except in public spaces, finishes and fixtures should be durable and economical. This is not typically the case in the current design. Furnishings may also need to be studied.
• 6000sf Storage Mezzanine, Building Maintenance Division, Locker Rooms, Café
These items need further discussion
Analysis of Functions
• Emergency Operations versus Central Offices
The most expensive elements of the proposed building are necessary to protect emergency operations (defined in the state building code as critical services) in time of emergency. These elements include ballistic building envelope, blast-resistant structure, internal power generation and specialized environmental systems. While we agree there may be some functional efficiencies gained by housing central office functions for fire and police in the same building, we believe that there are premium costs associated with housing non-emergency functions – accounting for roughly half of the proposed habitable space - in an emergency operations structure.
• Performance Improvements Reports
The January 29 staff reports indicate that most projected fire and police performance improvements would be achieved by consolidating central office functions. Few listed improvements require central office functions to be housed in an emergency operations building. In fact, the projected information technology performance improvements emphasize the location independence of communications and information access.
• Secure Functions versus Public Functions
The September 2008 Threat Assessment Report Conclusions states “The loading dock, the interior sally port and the public space on the first two floors are three areas primary vulnerabilities in the current design.” (p.8) The report describes hand- delivered bombings as “commonplace” in the U.S. (p.24) and “[w]ith both the exterior grounds and the ground floor of the facility open for un-screened public access, the hand-delivery of an improvised explosive device in these areas such as in a backpack or briefcase is a serious concern. Similar attacks could also be carried out using incendiary devices. If such an attack were carried out, the potential exists for casualties in the immediate vicinity of the event, as well as an increased potential for progressive collapse of the structure if an explosive device was placed near a structural column.” (p.31)
Our understanding is that that some or all columns have been redesigned to resist hand-delivered explosives, but that un- screened access is still planned for public spaces on the first two floors.
Alternate Scenario
Staff has identified functional benefits in combining emergency operations with police and fire central office functions, as well as urban benefits of combining an inviting series of public spaces on the bottom floors of a high-security emergency operations building. It appears, however, that these benefits may be outweighed by associated cost increases and safety compromises.
In order to understand the potential savings of housing central offices and highly public spaces separate from emergency operations, we would like to have cost breakdowns for this alternate scenario:
a. Renovate 110 S. McDowell St building for standard office use
b. Keep non-emergency police central office functions (evidence storage, detectives, administration, training, etc.) at Six Forks Rd or relocate to renovated 110 S. McDowell building
c. Keep non-emergency fire central office functions (fire prevention, fire training, administration, etc.) at Martin Street or relocate to renovated 110 S. McDowell building
d. Build new Emergency Operations Center (no un-screened public areas or non-emergency functions) on alternate site.
Other variations might include replacing the 110 S. McDowell building with private development fronting Nash Square and either consolidating police and fire central office functions into a future new office building or relocating some to existing decentralized stations around the city.
———————————-
As design and construction professionals, we take very seriously our responsibility to help meet the challenges presented to this project and to the citizens of Raleigh by this deep and prolonged recession. At a time when some are calling for burdensome tax increases and others are calling for painful service cuts, we believe there is a middle path that is responsive to our long-term emergency services needs - without raising taxes or overshadowing other important current and future needs of our citizens.
Russ Stephenson At-Large Councilor
Thomas Crowder District D Councilor
Bonner Gaylord District E Councilor
Politics , Other posts by David.
Thomas Crowder City Council Russ Stephenson Clarence E. Lightner Public Safety Center Bonner Gaylord
I’m glad to see this kind of analysis is happening. I was surprised to read comments in the earlier thread that wondered why Crowder and Stephenson, in particular, were being “reactionary” by putting the brakes on giving Russell Allen everything he wanted with no questions asked (which the council tends to do far too often). Every building project that comes before the city is asked to make changes to the original plans - sometimes very deep and significant changes. I don’t see any reason this building shouldn’t be subject to the same scrutiny, and I’m glad to see it happening. Meeker should get aboard the cost-cutting train here.
Where in the hell have Crowder and Stephenson been the last 2 years while we spent $25 million on the design of this project. both of these guys are architects and you are telling me that they were completely ignorant of all of the work that has gone into this project to-date.
They look like jackasses for pulling this card at the 11th hour. They could have easily rasied these objections in 2007 or 2008.
i hate these people so much. GO MOVE TO CARY, CROWDER/GAYLORD/STEPHENSON!
Joe, I agree with you. The City has already spent money on this project. Raleigh is growing, and although the project’s cost may warrant a tax increase, I think that in the long wrong it will be a valuable investment. The current design makes a strong statement for the life of downtown and the Nash Square area. I’m sure it will encourage further development.
Joe, you’ve got a fair point. But it’s also fair for council members to look at the plans again in a much tougher economy than we had in 2007. I’m not saying there’s not a ton of political cowardice on display here (good luck getting anyone to vote for raising property taxes this year), but I also think it’s crazy to think there wouldn’t be fat in the design that should be cut to reduce the cost of plans that were hatched in much better times.
I’m with Joe on this as well. Two years ago, the design issues in relationship to function and cost would have been the same. Costs are now 30 to 50% less for the same scope. It would have been more appropriate to raise these issues then, offering tax payees greater savings as the economy has slumped. Probably could have done it without any increases for that matter.